Production Process - Winding :
Production Process - Vapour Phase Drying :

|
- Fully automatic vapor phase drying plant.
- Drying cycle time depends on the size of the transformer. All transformers regardless of size apply this process.
- Complete interior assembly applies hot vapor drying procedure to remove moisture prior to vacuum filling with oil.
|
Production Process - ( Core and Win ding ) :

WINDINGS UNDER SHRINKAGE |

CRGO |

CRGO |
- Step lapped fully mitered cores are used
- The required width of low loss core steel are purchased from Nippon Steel, Japan, WISCO, China.
- Laminations are cut to length on GEORG cut- to-length line with step-lap cut and automatic stacking functions to high dimensional accuracy.
- Special clamping equipment ensures the tightness of steel core.
- Assembled in dust-free workshop

CORE ASSEMBLY IS READY |

ACTIVE PART – CORE and COIL ASSEMBLY |

FABRICATION |
Production - Sub assembles :
Production - 220kV Class Transformer :
 SFP10-200MVA/220kV |
 SFSZ-125MVA/220kV |
 SFPSZ11-180MVA/220kV |
Production - 330kV class (SFZ-125MVA/330kV) :

Cold welding - Tap winding lead |
 Cable connection between tap lead & tap changer |

Final assembly and test |
Production - 420kV class (SFZ-180(200)MVA/420-15.75kV) :

Coils assembly
|
 Fabrication of High voltage
winding |

Core lamination |

Transformer Under assembly |

ASSEMBLY OF CRGO |

Transformer ready for testing |
|