» Manpower
» Facilities
» Quality Inspection
» Machinery

Facilities :

 

Production Process - Winding :

 

Production Process - Vapour Phase Drying :


  • Fully automatic vapor phase drying plant.
  • Drying cycle time depends on the size of the transformer. All transformers regardless of size apply this process.
  • Complete interior assembly applies hot vapor drying procedure to remove moisture prior to vacuum filling with oil.

 

Production Process - ( Core and Win ding ) :


WINDINGS UNDER SHRINKAGE

CRGO

CRGO
    • Step lapped fully mitered cores are used
    • The required width of low loss core steel are purchased from Nippon Steel, Japan, WISCO, China.
    • Laminations are cut to length on GEORG cut- to-length line with step-lap cut and automatic stacking functions to high dimensional accuracy.
    • Special clamping equipment ensures the tightness of steel core.
    • Assembled in dust-free workshop

CORE ASSEMBLY IS READY

ACTIVE PART – CORE and COIL ASSEMBLY

FABRICATION

 

Production - Sub assembles :

 

 

Production - 220kV Class Transformer :


SFP10-200MVA/220kV

SFSZ-125MVA/220kV

SFPSZ11-180MVA/220kV

 

Production - 330kV class (SFZ-125MVA/330kV) :


Cold  welding - Tap winding lead

Cable connection between tap lead & tap changer

Final assembly and test

 

Production - 420kV class (SFZ-180(200)MVA/420-15.75kV) :


Coils assembly

Fabrication of High voltage
winding

Core lamination

Transformer Under assembly

ASSEMBLY OF CRGO

Transformer ready for testing

 

 

Distribution Transformers I Power Transformers I Cast Resin Transformers I Packaged Substations